Grove house London
60 week project for full refurbishment including complete new roof, fully boarded temporary roof and Monoflex sheeting
New build new floors
New build new floors being added to low level block of flats temporary roof
Bricklayers scaffold
Bricklayers scaffold traditional build for new houses and flats
Temporary roof with special access to London residence
Allow re-roof of lead to all areas beamed access with ladders down into the roof lantern area
University London
Specialist protection scaffold London Metropolitan University - - falling debris from building onto road and public highway. Double boarded and polythene over the top
Library SE London
Norwood library pavement scaffold foam sleeves and lighting pavement permits
East London Council
Access scaffold to allow the replacement of windows
Domestic static tower for windows
Static access towers to facilitate
Static access towers to facilitate the installation of winows - worthing
Temporary roof and access scaffold
Emergency call out offered to customers. Temporary roof and access scaffold had to be erected after a burn out in a house which affected the house either side
University SE London
Specialist access
Shooters hill SE London
Provide access scaffold fully boarded for decoration works to windows, brickwork repairs and, Gutter replacement works.
Speciallist access staircase
Emergency call burn out house in Woolwich
Domestic for painting
Static free standing tower
Static free standing tower for training of forklifts and rescue from fall arrest.
Hatton Garden
New extension to rear of building. Access scaffold erected with design to allow for the lifting of large steels.
University SE London
Commercial birdcage scaffold
University SE London – Eltham campus.
Allow fully boarded platform underside of glazed lantern area for replacement of glass and painting.
Fulham Palace road
Commercial external refurbishment fully boarded.
Special access scaffold for lift
Special access scaffold for lift shaft installation 25 metres high great Portland street.
Special system
Special system handrail/guardrail system to roof
Specialist access equipment
Specialist access equipment arranged with protection tower for 300kg hoist.
Temporary Roof Structure
East London Church
Following a burn out to the church, a scaffold was erected to support the remaining walls. JDM were contacted and asked to check and maintain the scaffolding existing to the structure resulting in additional scaffolding being installed for further support.
Romford east London
Access scaffolds for the installation of exterior insulation works – part of the Low Carbon Government Initiative
Temporary Roof Structure
Temporary Roof and independent scaffold structure off pavement – licences applied for
Support tower
Support tower to roof access scaffolding for access to chimney.
Berkley Square, London
Small access tower
Bromley, Kent, for private window installation.
London Painting
London – Painting to front and rear elevations.
Commercial Project
QUICK CONTACT
We use cookies to ensure that we give you the best experience on our website. If you continue to use this site we will assume that you are happy with it.Accept Cookies